Drilling out holes for the battery straps.
The front box, ready to go back in!
Moving the bug out of the way, so the MR2 can get on the lift.
The back box is almost finished...
Everything is in place up front.
The back box is almost finished...
Everything is in place up front.
David cutting apart the clutch disk to use in the coupler.
Ryan using the shop vacuum to pull cable through the heater channels.
Hunter removing the Thundersky cells from the trunk of the MR2.
Corey and Ryan working on the parking brake in the Bug.
Dillon grinding off the auxiliary output shaft on the motor so it will fit in the back of the VW.